Kpler LNG Interesting Moves (Released on 3 November 2016)

The Sabine Pass plant resumed LNG production this week, after being under maintenance since mid-September. Cheniere’s Clean Ocean loaded on 1-November, and Shell’s Methane Alison Victoria is currently lifting a cargo at the berth.

There are six more vessels expected to arrive in the next few weeks.

Also, we observed a record high send-in level on 1-November of 1,425 Bcf/d, which indicates that both trains are operating at full capacity.

The Soyo plant has come to a halt for planned maintenance. It is expected to last until mid-November, with loadings resuming right after.

At GorgonLNG Barka lifted a tender cargo on 27-October, and is signalling for Japan, ETA 8-November. Also, Asia Vision loaded on 1-November, and is making her laden voyage toward Chita, ETA 12-November.

BP’s British Merchant delivered her Atlantic LNG-sourced cargo at Hadera on 29-October

blog-orange-line

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s