Kpler EU Gas Weekly (Increase in Send-out level from South Hook)

Originally Released on 9 March 2017

EUROPEAN MARKET

North West Europe: Lineup and Inventories

Forecasted Vessels

  • South Hook:
Currently, three vessels expected at the terminal:
Aamira, ETA 16-March. The vessel is about to pass the Strait of Gibraltar.
Lijmiliya, ETA 21-March. She is now crossing the Red Sea.
Al Mafyar, ETA 28-March. The carrier is loaded and is now making her voyage toward the plant.
  • Dragon:
Al Nuaman is scheduled to discharge her Ras Laffan-sourced cargo on 14-March, ETA is confirmed by the Port Authority.
  • Gate:
There is no vessels expected at the terminal.
  • Grain:
Sonatrach’s Berge Arzew loaded at Bethioua on 2-March and is now discharging her cargo at the terminal. Initially the vessel was signalling for Aliaga, ETA 6-March.
  • Zeebrugge:
Milaha Qatar is expected by the Port Authority to arrive with her Ras Laffan cargo on 20-March.
  • Montoir:

There are two vessels scheduled to arrive from Bonny: LNG River Niger, ETA 8-March, and Catalunya Spirit, ETA 21-March.

Fosmax is planning a reduction in regasification capacity of 25% due to planned maintenance from 18-March to 7-May.

  • Rovigo:

Al Daayen, ETA 12-March

Al Marrouna, ETA 19-March

  • Swinoujscie:

Al Shamal loaded at Ras Laffan on 28-February and is currently delivering her cargo, ETA 20-March is confirmed by AIS.

  • Sines:

Operator REN plans to run a test on the terminal from 31-March to 1-April, which will give rise to 16 hours of potential shutdown to some parts of operations.

To Keep on Your Radar

Al Kharaitiyat loaded at Ras Laffan on 4-March and is now signalling for the N. Atlantic. Her potential destinations are in NWE.

 

LNG Data Analysis

Ras Laffan Cargo Liftings Weekly
This week we observe more vessels with destinations in Europe and India, and there is one cargo headed toward S.America on board Excalibur.
European Stocks and Send-outs

European Stocks and Send-Outs are computed Thursday-Thursday (@ 6:00 AM).

At South Hook, average send-out level increased from 78.77 to 247.74 GWh/d.
blog-orange-line