Main Highlights

Since July 30th, at Sabine Pass we observed a significantly decreased send-in level which corresponds to the production level of one Train. The weekly average send-in level was 1.79 Bcf/d.

Total’s newbuild Sk Audace is now ballasting towards Ras Laffan to load her maiden cargo, ETA 18-August. Also, Pan Asia is now performing sea trials.

The schedule of tender deliveries to ENARSA has been updated:

Kochi imports YTD 2017 have exceeded annual imports of any previous year. Their first Gorgon cargo was delivered aboard Petronet’s Prachi on 4-August.

Monthly Kochi Imports by Origin

Interesting Moves

Cheniere’s Clean Ocean loaded a cargo at Sabine Pass on 5-August and is now expected by Kpler analysts to deliver to Klaipeda, ETA 19-August. A second US-sourced cargo is expected to be delivered by Gas Natural Fenosa, ETA 12-September.

LNG Jurojin loaded at Sabine Pass on 4-August and is currently signalling for Ain Sokhna, ETA 27-August.

MLNG’s Seri Bijaksana loaded at Bintulu and is delivering to Dahej on 14-August. This is the second cargo delivered from Malaysia to Dahej since 2014.

Gaolan is to receive their first Atlantic LNG cargo aboard BP’s Symphonic Breeze, ETA 4-September.

Rasgas’ Al Thumama will deliver her Ras Laffan-sourced cargo to Zeebrugge on 31-August.

Two recent Soyo-sourced cargoes will be delivered to Brazil. Cool Runner is about to discharge her cargo at Pecem, ETA 10-August. Malanje is now making her laden voyage towards Bahia, ETA 12-August.

After floating for more than one month, Petrobras’ Esshu Maru discharged a partial cargo at Quintero on 9-August. Now the vessel headed towards Bahia to deliver the rest, ETA 28-August.

Cheniere’s Maria Energy is now ballasting towards Bonny to load a NLNG tender cargo, ETA 17-August.

Engie’s Bw Gdf Suez Brussels is expected to load at Soyo, ETA 16-August.